UMWELTTECHNIK & WASSERBAU GMBH, PÜCHAU

UMWELTTECHNIK & WASSERBAU GMBHPÜCHAU WATER MARCH! Insertion of two new pipes on the main water pipeline from Leipzig Turning old into new was the motto for our MAXIKraft group during their assignment. For the installation of two new pipes of the main water pipeline of Leipzig, the team came together from different branches for another … Read More

50HERTZ TRANSMISSION GMBH, PREILACK – STREUMEN

50HERTZ TRANSMISSION GMBH,PREILACK – STREUMEN THE HIGH WIRE ACT OF A DIFFERENT KIND Pole replacement on a 380 kV overhead line Tall MAXIKraft cranes announce the construction work from afar, as they were recently drawn to the municipality of Wülknitz for a two-day balancing and high-wire act of a somewhat different kind to carry out … Read More

ZOO LEIPZIG, LEIPZIG

ZOO LEIPZIG,LEIPZIG PACHYDERMS ON TOUR! How the MAXIKraft Group accompanied a very special moving Today, the editorial office of MAXIKraft Projects is handed over to two very special journalists: the elephant ladies Astra and Thuza take over the narration of a transport of a different kind. The date is September 24th. Today my aunt Astra … Read More

RADIO MAST, HERZBERG / ELSTER

RADIO MAST,HERZBERG / ELSTER https://www.maxikraft.de/wp-content/uploads/2020/09/20100_Maxikraft_Kran_Zeitraffer_CC00000000.mp4 NEW SOUND SYSTEM FOR THE BROADCASTING CIRCUIT Renewal of a DAB antenna in Herzberg/Elster We are in lofty heights, a cool breeze rounds the mobile crane. The crane carries an important cargo, which conjures up the most diverse sounds from rock to pop and classical music for the ears of … Read More

MAGDEBURGER DOM, MAGDEBURG

MAGDEBURG,MAGDEBURGER DOM THE LANDMARK IN A NEW SHINE The MAXIKraft Group lets Magdeburg Cathedral shine in a new light Throughout Germany, temperatures climb to the top of the thermometers every day as a large crane snakes its way through the streets of Magdeburg. The narrow width of the road does not make the journey any … Read More

DOCKS, GEIERSWALDER SEE

DOCKS,GEIERSWALDER SEE MAXIKRAFT ON THE BEACH! Pile driving at the sport boat harbour, Geierswalde water world A huge steel pillar hovers above the southern shore of the Geierswalder See. Slowly it approaches the water surface. It is suspended from the hook of an LTM 1500 all-terrain mobile crane. The purpose of the action: MAXIKraft helps … Read More

SCIENCE PORT, MAGDEBURG

LIFTING AND TRANSPORTOF THE SHIP TAUCHERSCHACHT 2 SCIENCE PORT, MAGDEBURG The “Taucherschacht 2″ in airy heights We were commissioned by our customer to take over the excavation of the ” Taucherschacht 2″ in the science port of Magdeburg. A site inspection in advance showed that the CC 3800 had to be used for this project … Read More

NEW CONSTRUCTION OF A HIGH-BAY WAREHOUSE

KRANLOGISTIK LAUSITZIN LOFTY HEIGHTS NEW CONSTRUCTION OF A HIGH-BAY WAREHOUSE In the course of the new construction of a high-bay warehouse, the assembly of the stacker cranes by Kranlogistik Lausitz GmbH was necessary. The high-bay warehouse was finally realised with a two-crane assembly. Two LTM1100-5.2 and one LTM 1070-4.2 were used for erecting and setting … Read More