DOCKS, GEIERSWALDER SEE

DOCKS,GEIERSWALDER SEE MAXIKRAFT ON THE BEACH! Pile driving at the sport boat harbour, Geierswalde water world A huge steel pillar hovers above the southern shore of the Geierswalder See. Slowly it approaches the water surface. It is suspended from the hook of an LTM 1500 all-terrain mobile crane. The purpose of the action: MAXIKraft helps … Read More

WINDPARK, SCHÖNWALDE / WALDOW

WINDPARK,SCHÖNWALDE / WALDOW https://www.maxikraft.de/wp-content/uploads/2020/07/20100_Maxikraft_Content_Development_Drohne_V01-2.mp4 118 TONS AGAINST THE WIND! Construction of a single wind turbine in Schönwalde Highest concentration! The crane operator’s hand is firmly attached to the joystick. His gaze fixes the height display. 149 meters above the ground hovers the enormous rotor blade of a new wind turbine. The blade gripper, a special … Read More

SCIENCE PORT, MAGDEBURG

LIFTING AND TRANSPORTOF THE SHIP TAUCHERSCHACHT 2 SCIENCE PORT, MAGDEBURG The “Taucherschacht 2″ in airy heights We were commissioned by our customer to take over the excavation of the ” Taucherschacht 2″ in the science port of Magdeburg. A site inspection in advance showed that the CC 3800 had to be used for this project … Read More

NEW CONSTRUCTION OF A HIGH-BAY WAREHOUSE

KRANLOGISTIK LAUSITZIN LOFTY HEIGHTS NEW CONSTRUCTION OF A HIGH-BAY WAREHOUSE In the course of the new construction of a high-bay warehouse, the assembly of the stacker cranes by Kranlogistik Lausitz GmbH was necessary. The high-bay warehouse was finally realised with a two-crane assembly. Two LTM1100-5.2 and one LTM 1070-4.2 were used for erecting and setting … Read More

AMEH, EISENHÜTTENSTADT

REPLACEMENT OF THE RAILWAY TRACK WITH APRECISE LANDING IN EISENHÜTTENSTADT AMEH, EISENHÜTTENSTADT Repair shutdown in steelworks This year, a repair shutdown took place at the Eisenhüttenstadt AMEH steelworks. The Eisenhüttenstadt branch of Kranlogistik Lausitz was commissioned with crane services, including the replacement of two crane girders. One crane girder had a weight of 80 tonnes. … Read More

CHEMICAL PLANT, SCHKOPAU

LIFTING HURDLESWITH THE MAXIKRAFT GROUP CHEMICAL PLANT, SCHKOPAU Heavy steel tank weighing several tons overcomes pipe bridge In connection with the expansion of a chemical plant, a 108-tonne, 33-metre long storage tank (L x W x H / weight: 33.5 x 5 x 5 m / 108.0 t) manufactured on site had to be moved … Read More