REPLACEMENT OF THE RAILWAY TRACK WITH A

PRECISE LANDING IN EISENHÜTTENSTADT

AMEH, EISENHÜTTENSTADT

Repair shutdown in steelworks

This year, a repair shutdown took place at the Eisenhüttenstadt AMEH steelworks. The Eisenhüttenstadt branch of Kranlogistik Lausitz was commissioned with crane services, including the replacement of two crane girders. One crane girder had a weight of 80 tonnes.

A total of four large cranes were used, two LTM 1750-9.1, one LTM 1400-7.1 and one LTM 1300-1. Due to the great lack of space, all crane installations were so-called spot landings. The passage under the converter for the LTM 1300-1 had to be created first. Due to the high time pressure, the fitters and crane operators were on site around the clock in shifts.

TECHNICAL SPECIFICATIONS

Weight component: 80 tons
Max. Projection: 26 meters
Hook height: 36 meters

TECHNOLOGY USED

- Two LTM 1750-9.1
- One LTM 1400-7.1
- One LTM 1300-1