Heavy load transport of four tube bundles

From the end of August till the beginning of September we had the task of transporting four pipe bundles from Hohenthurm to the SKW plant. Two 4-axle heavy duty tractors with an 18-axle THP-UT module from Goldhofer were used.

This task was carried out in a total of four transports within two weeks. The pipe bundles had a length of 18 metres, a weight of between 100 and 160 tonnes, a width of 4.50 metres and were up to 4 metres high. This results in a total length of a transport of 45.60 metres and a total weight of 285 tons.

TECHNICAL SPECIFICATIONS

TUBE BUNDS
Length: 18 meters
width: 4,5 meters
Height: up to 4 meters
Weight: 160 tons, 140 tons, 120 tons, 100 tons

TECHNOLOGY USED

- Two 4-axle heavy duty tractors
- One 18-axis THP-UT module